EV Charger Installation Cost NZ 2025: Complete Guide

12 min read

Quick Answer

EV charger installation in New Zealand costs $1,200-2,500 for a standard Level 2 home charger. Basic Level 1 installation costs $800-1,200. Level 2 (7.4kW) installation costs $1,500-2,500. Add $1,500-3,000 for switchboard upgrades if required. Installation takes 3-6 hours. Government rebates may reduce costs by $300-500.

EV Charger Installation Cost Breakdown 2025

Charger TypeInstallation CostCharging SpeedCharge Time
Level 1 (Portable)$800-1,2002.3kW8-12 hours
Level 2 (Home Wall)$1,500-2,5007.4kW3-5 hours
Level 2 (22kW 3-Phase)$2,500-4,00022kW1-2 hours
Commercial/DC Fast$15,000-50,00050-350kW15-45 min

Understanding EV Charger Types in New Zealand

Level 1 Charging (2.3kW - Standard Power)

Level 1 chargers plug into standard 230V 10A household sockets. They're the slowest but most affordable option.

Level 1 Specifications:

  • Power: 2.3kW (230V, 10A)
  • Charging Speed: 10-15km range per hour
  • Full Charge: 8-12 hours (typical 40kWh battery)
  • Installation: $800-1,200 (may use existing socket)
  • Best For: Overnight charging, low daily mileage (under 50km/day)
  • Electrical Requirements: Standard 10A circuit, no upgrades usually needed

Level 2 Charging (7.4kW - Recommended for Most Homes)

Level 2 chargers are the most popular choice for New Zealand homes. They require a dedicated circuit but charge 3x faster than Level 1.

Level 2 Specifications:

  • Power: 7.4kW (230V, 32A single-phase)
  • Charging Speed: 35-45km range per hour
  • Full Charge: 3-5 hours (typical 40kWh battery)
  • Installation: $1,500-2,500
  • Best For: Daily home charging, most EV owners
  • Electrical Requirements: Dedicated 32A circuit, may require switchboard upgrade

Level 2 Three-Phase (22kW - High-Performance)

Available for homes with three-phase power. Faster charging but higher installation cost.

What's Included in EV Charger Installation Costs?

1. Charger Unit Cost

2. Electrician Labour

3. Electrical Upgrades (If Required)

Upgrade TypeCost RangeWhen Required
Dedicated Circuit Installation$300-800All Level 2 chargers
Switchboard Upgrade$1,500-3,000Switchboards over 25 years old
Main Fuse Upgrade (63A to 80A)$500-1,200Insufficient capacity
Underground Cable Run (10-20m)$800-2,000Garage/carport far from house
Three-Phase Power Installation$3,000-8,00022kW charger (if not already 3-phase)

4. Additional Costs

Electrical Requirements for EV Chargers

Assessing Your Home's Electrical Capacity

Before installing an EV charger, your electrician will assess:

  1. Main Fuse Rating: Most NZ homes have 63A or 80A. Level 2 chargers draw 32A continuous load. You need spare capacity beyond normal household consumption (typically 20-30A during peak use).
  2. Switchboard Condition: Switchboards over 25 years old usually need upgrading. Modern chargers require RCD protection and dedicated circuit breakers.
  3. Cable Distance: Long cable runs (over 20m) from switchboard to charger location may require larger cables (6mm² or 10mm²) to prevent voltage drop.
  4. Existing Electrical Load: Homes with heat pumps, hot water cylinders, and induction cooktops may have insufficient spare capacity without upgrades.

Do You Need a Switchboard Upgrade?

You'll Likely Need a Switchboard Upgrade If:

  • ✓ Your home was built before 2000
  • ✓ Switchboard has ceramic fuses instead of circuit breakers
  • ✓ Main fuse is 40A or 50A (too small for EV charger)
  • ✓ No spare ways (slots) for additional circuit breakers
  • ✓ Lacks RCD (safety switch) protection
  • ✓ You experience frequent circuit trips with current appliances

Switchboard upgrades add $1,500-3,000 to your total cost. See our switchboard upgrade guide for details.

EV Charger Installation Process & Timeline

Step 1: Initial Assessment (Week 1)

Step 2: Planning & Approvals (Week 2)

Step 3: Electrical Upgrades (Week 3, if required)

Step 4: Charger Installation (Week 3-4)

Step 5: Post-Installation

Government Rebates & Incentives for EV Chargers

Current EV Charger Rebates in New Zealand (2025)

Available Rebate Programmes:

1. Low Emission Transport Fund (LETF)
  • Workplace Chargers: Up to 75% of installation costs (max $7,500 per charger)
  • Multi-Unit Dwellings: Up to 50% of costs (apartments, townhouses)
  • Eligibility: Businesses, body corporates, councils
  • Apply: EECA (Energy Efficiency and Conservation Authority)
2. Local Council Rebates
  • Auckland Council: $500 residential charger rebate (limited fund)
  • Wellington Council: Up to $400 for home chargers
  • Christchurch: $300 rebate for smart chargers
  • Check: Contact your local council for current programmes
3. Energy Retailer Incentives
  • Contact Energy: Free smart charger with EV electricity plan
  • Mercury: $200 credit on EV charging plan sign-up
  • Special Rates: Off-peak EV charging rates (9pm-7am) at 50-70% discount

How to Apply for EV Charger Rebates

  1. Check Eligibility: Visit EECA website and your council's sustainability page
  2. Get Quotes First: Most rebates require quotes from EWRB registered electricians
  3. Apply Before Installation: Many programmes require pre-approval
  4. Keep All Receipts: You'll need invoices and Certificate of Compliance
  5. Submit Within Timeframe: Usually 30-90 days after installation

Regional EV Charger Installation Costs

Costs by Major New Zealand Cities

Choosing the Right EV Charger for Your Home

Top EV Charger Brands in New Zealand

Charger BrandPower OptionsPrice RangeBest For
Tesla Wall Connector7.4kW - 22kW$800-1,200Tesla owners (works with all EVs)
Schneider EVlink3.7kW - 22kW$1,200-2,000Smart features, app control
JuiceBox (Enel X)7.4kW - 11kW$1,000-1,600WiFi connectivity, scheduling
Zappi (myenergi)7.4kW$1,400-1,800Solar integration, eco mode
ABB Terra AC7.4kW - 22kW$1,500-2,200Commercial/durability

Key Features to Consider

Running Costs: How Much Does EV Charging Cost?

Electricity Costs for Home EV Charging

Annual Charging Cost Calculator:

Based on average NZ electricity rates and typical driving patterns:

Daily DistanceEnergy UsedStandard RateOff-Peak Rate
30km/day5kWh/day$550/year$330/year
50km/day8.3kWh/day$915/year$550/year
100km/day16.7kWh/day$1,830/year$1,100/year

Assumptions: 16.7kWh/100km efficiency, $0.30/kWh standard rate, $0.18/kWh off-peak rate

Cost Comparison: EV vs Petrol

How to Save Money on EV Charger Installation

1. Compare Multiple Quotes

EV charger installation quotes can vary by 40-60% between electricians. Get at least 3 written quotes that clearly itemise charger cost, labour, and electrical upgrades.

2. Bundle with Other Electrical Work

Planning a switchboard upgrade or solar panel installation? Combine projects to save on callout fees and shared electrical work. You could save $300-600 on installation costs.

3. Choose Off-Peak Installation

Schedule installation during business hours (Mon-Fri, 8am-5pm). Weekend or after-hours installation costs 30-50% more in labour charges.

4. Plan Charger Location Strategically

Install your charger as close to the switchboard as possible. Every 10 metres of cable run adds $300-600 to installation costs. If garage is far from house, consider a sub-board closer to charger location.

5. Take Advantage of Rebates

6. Consider Level 1 for Low-Mileage Drivers

If you drive under 50km per day and can charge overnight, a Level 1 charger ($800-1,200) may be sufficient. You'll save $700-1,300 compared to Level 2 installation.

Common EV Charger Installation Issues

Insufficient Electrical Capacity

Problem: Older homes (pre-2000) often have 40A or 50A main fuses, insufficient for EV charger plus normal household load.
Solution: Upgrade to 63A or 80A main fuse ($500-1,200) and potentially switchboard ($1,500-3,000).
Prevention: Have electrician assess capacity before purchasing charger.

Long Cable Distance

Problem: Garage or carport is 30+ metres from switchboard.
Solution: Install sub-board closer to charger location ($800-1,500) or upgrade to larger cable (10mm²) for long run ($15-30/metre).
Alternative: Portable Level 1 charger if you have power socket in garage.

Shared Dwelling Challenges

Problem: Apartment or unit with shared power supply.
Solution: Apply for LETF multi-unit dwelling rebate. May require load management system or separate metering ($500-2,000).
Body Corporate: Obtain approval before installation (provide compliance documentation).

Three-Phase Availability

Problem: Want 22kW charger but home has single-phase power only.
Solution: Three-phase installation costs $3,000-8,000. Usually not cost-effective for residential unless already planned.
Alternative: 7.4kW single-phase charger meets most residential needs.

Questions to Ask Your Electrician

  1. Are you EWRB registered with EV charger installation experience? (Verify at ewrb.govt.nz)
  2. What's the total installed cost including all electrical upgrades?
  3. Do I need a switchboard upgrade for this charger?
  4. What's the maximum charging speed my electrical system can support?
  5. Which charger brands do you recommend and why?
  6. How long will the installation take?
  7. Will you provide Certificate of Compliance? (Legally required)
  8. What's included in your warranty?
  9. Can the charger integrate with solar panels if I add them later?
  10. Do you help with rebate applications?

Frequently Asked Questions

How much does EV charger installation cost in New Zealand?

EV charger installation in New Zealand costs $1,200-2,500 on average. Basic Level 1 charger installation costs $800-1,200. Level 2 home charger installation (most common) costs $1,500-2,500. Commercial installation ranges from $3,000-8,000. Costs include electrician labour, charger unit, electrical upgrades, and compliance certification.

What is the difference between Level 1 and Level 2 EV chargers?

Level 1 chargers use standard 230V 10A household power and charge at 2.3kW (8-12 hours for full charge). Level 2 chargers require dedicated 230V 32A circuit and charge at 7.4kW (3-5 hours for full charge). Level 2 is recommended for daily use, while Level 1 suits occasional charging or overnight top-ups.

Can I get a government rebate for EV charger installation in NZ?

Yes, the Low Emission Transport Fund may provide rebates for workplace and multi-unit dwelling EV chargers. Residential rebates vary by region - some councils offer grants up to $500. Contact your local council and check EECA (Energy Efficiency and Conservation Authority) for current rebate programmes.

Do I need to upgrade my switchboard for an EV charger?

Most homes require a switchboard upgrade for Level 2 EV chargers. Level 2 chargers need a dedicated 32A circuit, and older switchboards (pre-2000) typically lack capacity. Switchboard upgrades cost $1,500-3,000. An EWRB registered electrician will assess your electrical system and advise on necessary upgrades.

How long does EV charger installation take?

EV charger installation takes 3-6 hours for standard installations. Simple installations (charger near switchboard, no upgrades needed) take 2-3 hours. Complex installations requiring switchboard upgrades or long cable runs take 6-8 hours. Installation is typically completed in one day.

Get Free EV Charger Installation Quotes

Ready to install an EV charger at your home? Connect with up to 3 EWRB registered electricians experienced in EV charger installation. Compare quotes, check qualifications, and choose the best installer for your needs.